Overview of Buffalo Atlee 4
The Buffalo Atlee phase 4 project is located on parts of 2 quarter sections, and will include 2 total turbines, approximately 120 to 130 m in height from the ground to the nacelle (the “hub height”), where the blades connect to the tower. The blades will each be approximately 70 to 75 metres in length, and each tower will have a generating capacity of around 4.0 to 5.0 MW. The electrical (“collector”) system connecting the turbines to the grid will be buried between turbines and will follow the Range Road 91 right of way, and will connect to the existing above ground distribution lines along the road..
Access roads to the turbines will be required throughout the life of the project. Existing oil & gas access roads will be used and upgraded whenever possible, and new roads will be built according to discussions and agreements with landowners.
A detailed plan for the Phase 4 project can be found here .